JC Job Requirements Report window
Use this report to view the dates and required units of the phases and Cost Codes included in your jobs.
Start and End: Job Number, Cost CodeĀ
Type the job numbers and Cost Codes or use the Lookup to enter the range of jobs and Cost Codes you want to include on the report. If you want to view one job or Cost Code, enter the same value in the Start and End fields. If you want to view all jobs or Cost Codes, leave the default of Start and End.
Related Topics
Published date: 10/20/2020