Recalculating WIP
Use this option when your WIP history doesn’t match the Job tables. When you recalculate, errors in the Job tables will be corrected with the values in the WIP history table. You can run the Control Report to see which jobs need to be recalculated.
CAUTION: Always back up your data tables before you recalculate.
To recalculate WIP:
1 In Job Cost, select Resources and Tools > Recalculate WIP from the left navigation pane. The JC Recalculate WIP window opens.
Click thumbnail to view image.
2 Use the Lookup to select the range of jobs you want to recalculate or leave Start and End in the fields to recalculate all jobs.
3 Select OK to recalculate.
 
 
Published date: 03/27/2020